Monday, November 14, 2011

#6 Update

After 4 days of hauling 21 loads of material from various areas of the golf course, we have enough material to construct a tee, we think... 




With measurements we took prior to material being moved, we will restake the tee box and begin grading the tee top with the grade box.  Our goal is 1% of fall from back to front of the tee box, and a 4:1 slope off of the sides (or tee ring), tieing in nicely with the surrounding rough.